Article · AI & Product Delivery

Scoping an MVP and Deriving Epics: Risk First, Then Epics

Scope by risk, not by feature count – and cut across the whole journey.

Scope an MVP by risk, not by feature count: the minimum is whatever tests your most important, least proven assumptions. The result is a thin vertical slice through the whole journey, cut across all epics, not a few finished epics. AI drafts fast, but it prioritizes poorly and makes scope creep cheap.

STEP 01

Name the artifact

“MVP” is used for two different things: a learning vehicle (Ries, Pichler) and the smallest shippable product. Teams that use one word for both argue past each other. Give them separate names:

Learning test

Built to learn, not to ship: mock-up, landing page, smoke test.

Also called: MVP Test (Cagan) · RAT, riskiest assumption test (Higham) · ETP (Kniberg)

First release

The smallest product real customers can use and that you can ship.

Also called: MMP (Pichler) · EUP · SLC (Cohen)

When to skip the MVP

When you already know what to build, or for features of a mature product. There is no assumption left that a learning test would settle.

STEP 02

Find the riskiest assumption and the minimum

Use David Bland’s Assumptions Mapping: write each assumption as “We believe that …”, place it on a 2×2 of importance × evidence, and test the important, unproven ones first – usually desirability. Then ask with Higham: what is the smallest thing that tests the riskiest assumption?

Five criteria for the minimum:

Criterion Question Source
RiskDoes it test the most important, least proven assumption?Bland, Higham
CompletenessDoes the journey work end to end? No “car without brakes”.Patton
Must testWould you cancel the release without it? If a workaround exists, it is not a Must.DSDM
BaselineIs it better than the workaround users have today?Shape Up
JustificationCan you explain why each item is in?CIO.de
Read the market

In a crowded market the minimum needs your differentiators; in a novel one, the basics (Xebia).

GDPR basics are Musts

With personal data, the basics of privacy by design (Art. 25) belong in the Musts. Data-free risk tests avoid most of it.

STEP 03

Derive epics

Agree on the hierarchy first. “Epic” means different things in different frameworks, and “feature” sits above the epic in some and below it in others:

Source What an epic is
Mike CohnA large user story
AtlassianA body of work of about one month to a quarter
SAFeA portfolio initiative with its own MVP
Scrum GuideNo epics; the Product Goal sets the direction

Then follow the chain:

  1. Vision / Product Goal
  2. Impact Map or OST (+ JTBD)
  3. Story-map backbone = epics
  4. Stories

Optionally add EventStorming to find enabler and domain epics that the user journey does not show.

Example prompt · Backbone and stories
Product Goal: [...]. Impact map / opportunity tree: [...].
1. Propose a story-map backbone: the user activities, left to right.
   Each activity is one epic.
2. Under each activity, list candidate stories.
3. Mark every assumption as [ASSUMPTION].
4. Do not rank activities against each other.
STEP 04

Cut the MVP slice

Don’t prioritize the backbone against itself; prioritize underneath it (Jeff Patton). Every activity of the journey needs to be there; what you choose is how thin each one is. The MVP is the first slice across all of them.

Why epic-level ranking backfires

If you rank whole epics, the team builds the nice-to-haves of the top epics before the core stories of the lower ones (Harde, IREB). The fix: split each epic into containers such as “X (Base)” and “X (Extension #1)”, and rank the containers.

Techniques by level:

Impact Map Story-map slices Hamburger method SPIDR Elephant Carpaccio Shape Up appetite MoSCoW quota
STEP 05

Write and split epics

SAFe treats an epic like its own small MVP: tested with real customers, built around a hypothesis, with a cost cap, ending in a decision to persevere, pivot or stop. Borrow that discipline for every epic.

Epic template
Hypothesis statement
Leading indicators
In scope / out of scope
NFRs, incl. GDPR
Cost or time cap
Acceptance criteria

Splitting patterns (Humanizing Work):

Workflow steps CRUD operations Rule variants Data variants Simple / complex Defer performance Spike last
AI drafts – with a preview

Let AI draft epics only where you can preview and edit before anything lands in the backlog, as with Jira Rovo. Give it your own examples of good epics instead of letting it guess the format (Wolpers).

STEP 06

Prioritize

Separate two questions: what is in (the cut line) and in which order. They need different tools.

Cut line
MoSCoW + Kano basics

Keep Musts at or below about 60 % of the effort and write the Won’t list down. Check Kano basics: what users take for granted.

Order
WSJF or RICE

WSJF = cost of delay ÷ size, with a risk term for enablers. Teresa Torres sizes opportunities without effort, to keep the focus on value.

The numbers are a conversation aid, not the decision. That matters even more when AI produces them:

Moderate

alignment of AI rankings with experts, and weakest exactly at the top priorities (Tampere)

5 of 9

AI prioritizations felt fit; the WSJF ranking was not traceable (e-Informatica 2026)

STEP 07

Fix the scope, use AI as a critic

When AI builds fast, adding one more feature feels free. Anthropic calls this zero-friction scope creep. Write the scope down before building:

Won’t havesWhat is explicitly out
Evidence thresholdWhat result counts as learned
MetricsE.g. day-7 and day-30 retention
CapTime or budget limit

Give AI its roles in this order:

  1. Critic first: let it review your epics and stories, as Mountain Goat’s Story Critic does.
  2. Author only with human sign-off.
  3. Prioritizer only as preparation for the team’s decision.
Drafts need revision

In Pasquale’s work, 21 AI-generated stories shrank to 16 after review, and the structure got lost beyond about 100 requirements. Wolpers adds context gaps, a bias towards what is easy to measure, and over-trust in the output.

WATCH OUT

Pitfalls

One word “MVP” for two different things
Testing low-risk assumptions first
One epic complete, gaps in the journey
Ranking at epic level
Splitting by layer instead of vertically
Musts above 60 %
No written Won’t list
GDPR postponed to later
A single LLM run taken as the ranking
Unedited AI epics in the backlog
Vendor numbers taken as facts
CHECKLIST

Checklist

SOURCES

Sources

Kniberg · Cohen · Pichler · SVPG (Cagan) · Higham · Strategyzer (Bland) · Patton · Adzic · Cohn / Mountain Goat Software · Cockburn · Shape Up · Agile Business Consortium (DSDM) · SAFe · Atlassian · Scrum Guide · Torres · Humanizing Work · Intercom · Black Swan Farming · t2informatik · CIO.de · Xebia · Computerwoche · IREB (Harde) · Scrum.org (Wolpers) · GI · Anthropic · arXiv / Tampere University / e-Informatica